Project reference

Quzhou Yuanli 50t/h High-Temperature, High-Pressure Coke Dry Quenching Waste Heat Boiler

The Quzhou Yuanli 50t/h high-temperature, high-pressure coke dry quenching waste heat boiler reference, presented with two case images.

Quzhou Yuanli 50t/h High-Temperature, High-Pressure Coke Dry Quenching Waste Heat Boiler
Quzhou Yuanli 50t/h High-Temperature, High-Pressure Coke Dry Quenching Waste Heat BoilerOriginal image

Project overview

Quzhou Yuanli is a 50t/h high-temperature, high-pressure coke dry quenching waste heat boiler reference in HBG Industrial Boiler’s product range. Two case images are presented together under the same project name.

For similar coke dry quenching projects, solution discussions can cover the coking process, steam requirements and site interfaces to establish how the boiler will connect with the coke dry quenching and energy systems.

Coke Dry Quenching Waste Heat Boiler

More reference images

Quzhou Yuanli 50t/h High-Temperature, High-Pressure Coke Dry Quenching Waste Heat Boiler

Quzhou Yuanli 50t/h High-Temperature, High-Pressure Coke Dry Quenching Waste Heat Boiler

Product background

Related product technology

The coke dry quenching waste heat boiler range addresses heat recovery in coke dry quenching. The company product materials record manufacturing experience for top-charged coke ovens and development work on waste heat boilers for stamp-charged coke ovens.

This section describes the product series. It does not establish the configuration or measured performance of this individual project.

Plan your project

Discuss Coke Dry Quenching Waste Heat Boiler with our team

Share the information below to help our team assess your requirements. Equipment parameters and expected energy savings will be confirmed for your operating conditions.

What information should I prepare?
Project & heat source
Location, industry, heat source or fuel, and available operating data
Steam & heat demand
Intended use, required output, pressure and temperature
Site & delivery
Layout, connection requirements, schedule and scope of supply

Send a project inquiry

* Required. Provide at least an email address or a phone number. Product, reference case and source page are included automatically.

Reference case: Quzhou Yuanli 50t/h High-Temperature, High-Pressure Coke Dry Quenching Waste Heat Boiler

Email or phone is required. Include your country code for international calls.

Preparing secure form…

Business email: ye.leijie@xizice.com