Boiler products

Coke Dry Quenching Waste Heat Boiler

Explore project references and discuss equipment requirements for your operating conditions.

Product & technical overview

Our company is a domestic top-mounted coke oven coke dry quenching waste heat boiler manufacturer. On this basis, in 2010, our company carried out the research and development of coke dry quenching waste heat boiler for tamping coke ovens. In 2011 the project was included in the major scientific and technological innovation project of Hangzhou, and in 2012, the boiler successfully developed was installed in Quzhou Yuanli Metal Products Co., Ltd., and the operation was very stable. In 2014, it passed the evaluation of Hangzhou Science and Technology Bureau.

Plan your selection

Product selection information

A starting point based on company product materials. The checklist helps scope your project; suitability requires technical review.

Application, heat source, process, scope and project data
Industries & applicationsCoke dry quenching heat recovery; company materials cover top charging and stamp charging coke ovens.
Heat source / fuel conditionsHeat from the dry quenching system; operating data is required.
Process & design featuresQuzhou Yuanli and Xinyang Steel references available; confirm design and parameters for the project.
Equipment & servicesBoiler equipment; associated systems, installation and engineering scope require project confirmation.
Operating data to prepareCoke oven and dry quenching system data, heat source conditions, load, steam and power needs, space and interfaces.
Parameters & performanceOutput, pressure, temperature, efficiency and energy savings are determined for the project operating conditions. Reference project names do not establish ratings for a new project.
Related project referencesView all 2 references

Source: company product descriptions and original project references. Technical features describe the product series; configuration and service boundaries require confirmation.

Discuss this product

Applications

Project references

Project updates

Delivery milestones & customer feedback

Dated company reports on specific projects and customer feedback.

Plan your project

Discuss Coke Dry Quenching Waste Heat Boiler with our team

Share the information below to help our team assess your requirements. Equipment parameters and expected energy savings will be confirmed for your operating conditions.

What information should I prepare?
Project & heat source
Location, industry, heat source or fuel, and available operating data
Steam & heat demand
Intended use, required output, pressure and temperature
Site & delivery
Layout, connection requirements, schedule and scope of supply

Send a project inquiry

* Required. Provide at least an email address or a phone number. Product, reference case and source page are included automatically.

Email or phone is required. Include your country code for international calls.

Preparing secure form…

Business email: ye.leijie@xizice.com