Boiler products
Coke Dry Quenching Waste Heat Boiler
Explore project references and discuss equipment requirements for your operating conditions.
Switch productCoke Dry Quenching Waste Heat Boiler
Product & technical overview
Our company is a domestic top-mounted coke oven coke dry quenching waste heat boiler manufacturer. On this basis, in 2010, our company carried out the research and development of coke dry quenching waste heat boiler for tamping coke ovens. In 2011 the project was included in the major scientific and technological innovation project of Hangzhou, and in 2012, the boiler successfully developed was installed in Quzhou Yuanli Metal Products Co., Ltd., and the operation was very stable. In 2014, it passed the evaluation of Hangzhou Science and Technology Bureau.
Plan your selection
Product selection information
A starting point based on company product materials. The checklist helps scope your project; suitability requires technical review.
| Industries & applications | Coke dry quenching heat recovery; company materials cover top charging and stamp charging coke ovens. |
|---|---|
| Heat source / fuel conditions | Heat from the dry quenching system; operating data is required. |
| Process & design features | Quzhou Yuanli and Xinyang Steel references available; confirm design and parameters for the project. |
| Equipment & services | Boiler equipment; associated systems, installation and engineering scope require project confirmation. |
| Operating data to prepare | Coke oven and dry quenching system data, heat source conditions, load, steam and power needs, space and interfaces. |
| Parameters & performance | Output, pressure, temperature, efficiency and energy savings are determined for the project operating conditions. Reference project names do not establish ratings for a new project. |
| Related project references |
|
Source: company product descriptions and original project references. Technical features describe the product series; configuration and service boundaries require confirmation.
Discuss this productApplications
Project references

Coke Dry Quenching Waste Heat Boiler
Quzhou Yuanli 50t/h High-Temperature, High-Pressure Coke Dry Quenching Waste Heat Boiler
The Quzhou Yuanli 50t/h high-temperature, high-pressure coke dry quenching waste heat boiler reference, presented with two case images.
Explore this case
Coke Dry Quenching Waste Heat Boiler
Xinyang Steel 50t/h High-Temperature, Ultra-High-Pressure Coke Dry Quenching Waste Heat Boiler
The Xinyang Steel 50t/h high-temperature, ultra-high-pressure coke dry quenching waste heat boiler reference, illustrating equipment for CDQ heat recovery.
Explore this caseEngineering & manufacturing support
Project updates
Delivery milestones & customer feedback
Dated company reports on specific projects and customer feedback.
Plan your project
Discuss Coke Dry Quenching Waste Heat Boiler with our team
Share the information below to help our team assess your requirements. Equipment parameters and expected energy savings will be confirmed for your operating conditions.
What information should I prepare?
- Project & heat source
- Location, industry, heat source or fuel, and available operating data
- Steam & heat demand
- Intended use, required output, pressure and temperature
- Site & delivery
- Layout, connection requirements, schedule and scope of supply
Business email: ye.leijie@xizice.com