Boiler products
Gas Turbine Waste Heat Boiler (HRSG)
Explore project references and discuss equipment requirements for your operating conditions.
Switch productGas Turbine Waste Heat Boiler (HRSG)
Product & technical overview
The coking process produces a large amount of coke oven gas, usually directly burned, or gas purification to extract gas, tar, etc. With the improvement of small gas turbine technology and cost reduction, the use of small gas turbine + waste heat power generation this more and more efficient and environmentally friendly way is more and more accepted by coke enterprises, with the popularity of waste heat power generation, 6B and below all kinds of small gas turbine waste heat boiler has become a research hotspot of enterprises, product parameter settings from single pressure to double pressure, three pressure, etc., the circulation mode has two types of natural circulation and forced circulation, at the same time, the heating surface layout can choose vertical and horizontal layout, using modular design, corresponding to different specifications of small gas turbines, Realize the serialization of boiler design.
Plan your selection
Product selection information
A starting point based on company product materials. The checklist helps scope your project; suitability requires technical review.
| Industries & applications | Heat recovery and power generation associated with small gas turbines. |
|---|---|
| Heat source / fuel conditions | Gas turbine exhaust; turbine documentation and exhaust conditions are needed. |
| Process & design features | Single, dual and triple pressure options; natural or forced circulation; vertical or horizontal arrangement and modular design. |
| Equipment & services | Boiler equipment; associated systems, installation and engineering scope require project confirmation. |
| Operating data to prepare | Turbine model and exhaust curves, operating mode, steam and pressure level needs, water conditions, interfaces and installation space. |
| Parameters & performance | Output, pressure, temperature, efficiency and energy savings are determined for the project operating conditions. Reference project names do not establish ratings for a new project. |
| Related project references |
|
Source: company product descriptions and original project references. Technical features describe the product series; configuration and service boundaries require confirmation.
Discuss this productApplications
Project references

Gas Turbine Waste Heat Boiler (HRSG)
Shandong Yongfeng 130t Gas Turbine Waste Heat Boiler
A 130t gas turbine waste heat boiler reference for Shandong Yongfeng, illustrating heat recovery equipment associated with a gas turbine.
Explore this case
Gas Turbine Waste Heat Boiler (HRSG)
Shandong Yongxin T130 Gas Turbine Waste Heat Boiler with Fresh-Air Supplementary Firing
A waste heat boiler reference for the Shandong Yongxin T130 gas turbine, identified with fresh-air supplementary firing.
Explore this caseEngineering & manufacturing support
Plan your project
Discuss Gas Turbine Waste Heat Boiler (HRSG) with our team
Share the information below to help our team assess your requirements. Equipment parameters and expected energy savings will be confirmed for your operating conditions.
What information should I prepare?
- Project & heat source
- Location, industry, heat source or fuel, and available operating data
- Steam & heat demand
- Intended use, required output, pressure and temperature
- Site & delivery
- Layout, connection requirements, schedule and scope of supply
Business email: ye.leijie@xizice.com