
Project overview
The Shandong Yongxin project is a waste heat boiler reference associated with a T130 gas turbine and identified with fresh-air supplementary firing in HBG Industrial Boiler’s product materials.
For similar requirements, gas turbine exhaust information, fresh-air supplementary firing needs and intended steam use can support discussions about interfaces with the turbine and site systems.
Gas Turbine Waste Heat Boiler (HRSG)Product background
Related product technology
The gas turbine waste heat boiler range addresses heat recovery associated with gas turbines and uses modular design. Range-level design options include pressure systems, circulation methods and vertical or horizontal arrangements for different gas turbines.
This section describes the product series. It does not establish the configuration or measured performance of this individual project.
Plan your project
Discuss Gas Turbine Waste Heat Boiler (HRSG) with our team
Share the information below to help our team assess your requirements. Equipment parameters and expected energy savings will be confirmed for your operating conditions.
What information should I prepare?
- Project & heat source
- Location, industry, heat source or fuel, and available operating data
- Steam & heat demand
- Intended use, required output, pressure and temperature
- Site & delivery
- Layout, connection requirements, schedule and scope of supply
Business email: ye.leijie@xizice.com
